Burlington Electric Department filed an application on Oct. 30 for a new major license for the Chace Mill Hydroelectric Project on the Winooski River in Burlington and Winooski, and the Federal Energy Regulatory Commission has set a preliminary schedule that puts acceptance in May 2027. The project is numbered 2756-068.

The Federal Register notice, dated Nov. 10 and published Nov. 16, says the application is not ready for environmental analysis. It targets a notice of acceptance and readiness for environmental analysis in May 2027, with recommendations, preliminary terms and conditions and fishway prescriptions due in July 2027. Final amendments to the application are due 30 days after the notice of readiness is issued.

The project

The project includes a dam about 252.6 feet long and 29 feet high, with two spillway sections topped by inflatable rubber crest gates, and a powerhouse with three 2.485-megawatt Kaplan turbine-generator units, for a total installed capacity of 7.455 megawatts. The dam creates a 6.7-acre impoundment and a bypassed reach of the river about 230 feet long. Power moves to the grid on an underground 400-foot, 13.8-kilovolt line.

Fish passage facilities include a downstream fishway and an upstream trap-and-truck facility with a concrete fish lift on the west side of the powerhouse. Recreation facilities include a 660-foot paved walkway, a 745-foot public access trail and an overlook on top of the powerhouse.

The notice names James Gibbons, Burlington Electric's director of policy and planning, as the applicant contact and Joshua Dub of FERC's Division of Hydropower Licensing as the commission contact. The application can be viewed on FERC's eLibrary under docket number 2756. People who want to file interventions or comments can contact FERC's Office of Public Participation at 202-502-6595.