The New Hampshire Department of Environmental Services proposes to certify a revised federal discharge permit for Manchester's wastewater plant that would cap ammonia at a monthly average of 3,407 pounds a day from June 1 through Sept. 30. The state will take written comments until 4 p.m. on Dec. 17.
DES received a request on Oct. 1 from the U.S. Environmental Protection Agency's New England office to certify the draft revision under Section 401 of the Clean Water Act, according to the DES notice. DES says the certification checks that the permit meets New Hampshire's surface water quality standards, and it proposes to grant it. Only written comments are accepted. Email is preferred, at NPDES401Certification@des.nh.gov; mail goes to Hayley Franz, Permits and Compliance Section, NHDES Wastewater Engineering Bureau, P.O. Box 95, Concord, NH 03302-0095.
Why the limit was rewritten
According to the EPA's draft permit and statement of basis, EPA issued the Manchester permit on Nov. 3, 2025, with an ammonia limit of 10.4 mg/L for June through September. The City of Manchester petitioned the agency's Environmental Appeals Board on Dec. 3, 2025, to review several conditions, including that limit. During settlement talks the city gave EPA new information on the cost and feasibility of meeting a concentration-based limit, and EPA withdrew the limit on Sept. 25, 2026.
The replacement is a monthly average of 3,407 lb/day, measured twice a week. EPA says both versions protect the state's ammonia standard and that the load-based limit gives the plant more operating flexibility at average flows. EPA calculated the figure from the river's lowest expected flow (436.7 million gallons a day) and the plant's lowest monthly average discharge (12.4 million gallons a day, in August 2022).
A compliance schedule of more than two years
The draft gives the city time to meet the limit. Manchester must report to EPA on its progress within 12 months of the revision taking effect. The limit then starts on the first June that falls after 24 months from the effective date.
EPA's statement of basis says the plant's recent upgrade was built to remove phosphorus, not ammonia, and that the process changes that help one pollutant work against the other. EPA also says the plant will likely meet the new limit most of the time even without changes. If the city decides after a 12-month optimization study that a major upgrade is necessary, it may ask EPA to discuss a longer schedule through an administrative order; any such request must include a financial analysis.
What the revision leaves out
The change is narrow: only the ammonia limit and its schedule are open for comment. The permit covers discharges from the plant at 300 Winston St. and 15 combined sewer overflow outfalls to the Merrimack River, the Piscataquog River, Rays Brook, Baker Brook and an unnamed brook. Bedford, Goffstown and Londonderry are co-permittees for the sewer-system conditions.
The Conservation Law Foundation separately contested parts of the 2025 permit. EPA's draft says the Environmental Appeals Board partially remanded the permit to the agency to correct statements in its response to comments and to evaluate whether PFAS are or may be discharged at a level that could cause or contribute to a water quality excursion. EPA says it will handle that through a separate future action, not this revision. The draft also cites an EPA notice that puts the permit's uncontested conditions into effect on Nov. 1, 2026.
DES says EPA's public notice, issued Oct. 1, provided a comment period until Nov. 2. The EPA permit page lists the draft documents.