The operator of an East Lyme solar facility told the Connecticut Siting Council on Nov. 5 that no noise study was done before it replaced the site's inverters, and the council closed the evidentiary record the same day.
The council voted unanimously that day to deny MN8 Energy's Oct. 26 request to postpone the enforcement hearing. It said it had voted Sept. 3 to hold the hearing, published notice Sept. 9 and would incur added costs to reschedule, according to its Nov. 6 letter. It also denied MN8's objection to items it had entered into the record by administrative notice.
The council has not issued findings or set any penalty. Parties may file briefs and proposed findings by Dec. 5, when the public comment period also closes, according to the council's revised schedule. The deadline for a final decision is March 5, 2027.
The case, Petition 1056, concerns the 5.0-megawatt facility off Grassy Hill and Walnut Hill roads that the council approved in 2013. After a neighbor complained June 10 about noise from a new machine, the council asked the owner of record on June 12 about the equipment. Its July 7 enforcement notice said no response arrived and that it had reason to believe the site violated a condition of the 2013 approval because equipment changes had not been submitted to the council. The notice said the council would fine the owner $1,000 a day beginning the 21st day after receipt. The owner of record, GRE 314 East Lyme LLC, requested a hearing July 27.
MN8, which operates the site, replaced eight 500-kilowatt inverters with 16 smaller units, with the same alternating-current output, an MN8 witness testified. MN8 says the old model was discontinued in late 2017 and failed often, and that it treated the swap as a one-for-one replacement that needed no notice to the council.
James Bullock, an MN8 director of asset management, wrote in pre-filed testimony that no sound study was done on either the new or the old inverters. At the hearing, council staff asked whether the new units could have raised noise levels by six decibels or more, and an MN8 witness said they could have. The witness said he did not know whether the new units are louder than the old ones and that MN8 would provide its sound-study data to the council. A council member said nothing in the record shows the replacement added less than six decibels, because MN8 has a figure for the new units but none for the old ones.
The old inverters' specification sheet lists 58 decibels at 3 meters, a Greenskies Clean Energy witness told council staff at the hearing. The new units are rated at less than 85 decibels at 1 meter, according to MN8's Sept. 3 letter. The two ratings use different distances.
MN8's letter estimates 53.6 decibels at 122 feet, below the 55-decibel daytime limit it cites for the site. The letter describes 122 feet as the distance to the neighbors' property. At the hearing, Bullock said it is the distance to the neighbors' house, and a Greenskies Clean Energy witness estimated the property line is about 80 feet from the edge of the equipment pad, measured from satellite images. The formula MN8 used gives higher levels at shorter distances.
MN8 said in pre-filed testimony that it has hired Tech Environmental to study sound levels at the site boundary. At the hearing, an MN8 witness said a construction-grade sound curtain around the inverter skid nearest the neighbors had not yet been installed and was expected early the following week. MN8 had not filed study results as of the council's Nov. 6 docket entries.
Ownership was also corrected at the hearing. A July 27 letter filed for the original owner said GRE 314 East Lyme LLC sold the project in 2019. A Greenskies Clean Energy witness said instead that what was sold on Dec. 30, 2019 was Greenskies Power Group LLC, a parent of the project company. MN8's filings say the same and that GRE 314 East Lyme LLC still owns the project and is its indirect subsidiary.